Hebi Waste Heat Utilization Project

2024/12/27 11:54

Construction Scale

Phase I: Heating area of 5 million m²

Phase II: Heating area of 7.1 million m²

Location:Northeast of Hutang Village & Southeast of Yang Xiaotun Village, Pangcun Town, Northwest of Qibin New District, Hebi City, Henan Province (approx. 3.5km from the project reference point).

Construction Unit:Beijing Huayuan Taimeng Energy Saving Equipment Co., Ltd.

Project Manager:Ai Hua

Design Duration:2 months

Completion Date:October 2019

Construction Content:

The project employs a heating-steam-driven absorption heat pump system to recover waste heat, with the steam engine backpressure strictly controlled at ≤ 11.2kPa. The absorption heat pump unit is engineered to achieve a minimum waste heat recovery capacity of 69MW, optimizing energy efficiency through advanced thermal recycling technology.

Hebi Waste Heat Utilization Project

Hebi Waste Heat Utilization Project


Hebi Waste Heat Utilization Project


Hebi Waste Heat Utilization Project


Hebi Waste Heat Utilization Project


Hebi Waste Heat Utilization Project


Hebi Waste Heat Utilization Project