Construction Unit: Mengyin Xiangtai Energy Co.
Project Location: Mengyin County, Linyi City, Shandong Province, China
Planned Investment: Approximately CNY 650 million
Project Director: Shi Derui
Completion Date: March 2021
The project involves the design of a complete set of construction drawings for the heat source plant, heating stations, and steam pipe networks, ensuring comprehensive and professional design solutions for the entire construction.
The project features the installation of 2×150t/h and 2×200t/h high-temperature and high-pressure circulating fluidized bed boilers, accompanied by a 1×CB20MW extraction back-pressure turbogenerator unit and a 1×B50MW extraction back-pressure unit. It also includes an 8-million-square-meter heating main station, 25 kilometers of medium and low-pressure steam pipelines, a DN1100 steam header, DN900 hot water supply and return pipelines, and steam pipes with diameters ranging from DN150 to DN500, forming a robust and integrated energy supply system.
![Mengyin Cogeneration Project Design Mengyin Cogeneration Project Design]()