Mengyin Cogeneration Project

2024/12/30 09:42

Project Overview

  • Construction Unit: Mengyin Xiangtai Energy Co.

  • Project Location: Mengyin County, Linyi City, Shandong Province, China

  • Planned Investment: Approximately CNY 650 million

  • Project Director: Shi Derui

  • Completion Date: March 2021

Design Scope

The project involves the design of a complete set of construction drawings for the heat source plant, heating stations, and steam pipe networks, ensuring comprehensive and professional design solutions for the entire construction.

Design Schedule

  • Heat Source Plant: 5 months

  • Heat Supply Main Station and Pipe Networks: 4 months

Construction Details

The project features the installation of 2×150t/h and 2×200t/h high-temperature and high-pressure circulating fluidized bed boilers, accompanied by a 1×CB20MW extraction back-pressure turbogenerator unit and a 1×B50MW extraction back-pressure unit. It also includes an 8-million-square-meter heating main station, 25 kilometers of medium and low-pressure steam pipelines, a DN1100 steam header, DN900 hot water supply and return pipelines, and steam pipes with diameters ranging from DN150 to DN500, forming a robust and integrated energy supply system.

Mengyin Cogeneration Project Design