Montenegro Heat Source Plant Project
2024/12/30 09:29
Total planned investment: RMB 4 billion
Phase I Completion:
Annual heat supply: 2.66 million GJ
Heating coverage: 6.2 million square meters
Phase II Completion:
Annual heat supply capacity: 4.5 million GJ
Design Services (Phase I):
Preliminary design and construction drawing design for 3 sets of 116MW high-temperature hot water circulating fluidized bed boilers.
Construction Scope:
Installation of 5 sets of 116MW high-temperature hot water circulating fluidized bed boilers.
Construction of supporting pipeline networks for integrated heat supply system.